One of the new sections of the N332 is near complete. Aldesa have been working in both directions from Torrevieja towards Guardamar and towards Pilar de la Horadada to widen the existing road and make it a dual carriageway with two lanes in each direction.
The section towards Guadamar will open in April ready for the Easter traffic to the coast. This will provide improved access to La Mata and to the north of Torrevieja at two new roundabouts.
1 comment:
This is good news. They've been doing this for ages and it should have been finished by now. Hopefully, it will make the junction with the Montesinos road a load safer (this must currently be one of the most dangerous junctions on the Costa Blanca). I wonder if it will make the road a bit more cycle friendly -doubtful!
Post a Comment